This is an old revision of the document!
This was my primary responsibility for 5 years at my previous employer. It began when they bought a complete robot integration for the first robodrill. I was tasked with copying the installation across several different models of robodrill for a total of 5 installations. I started by diagramming the electronic and pneumatic systems as well as gathering specifications for each component. I copied the design of the table and subcontracted it to a local fabricator.
Unfortunately, I have no pictures of the installation without parts in them that would violate the NDAs with the companies we were contracted to. I am including images of the CAD models we based the installation on.